New Headquarters Progress Update

3/31/2015

Moving begins

9/12/2014

Updates from the summer

1/17/2014

Framing for the offices is almost complete.

1/7/2014

Framing, Sheetrock, and electrical on the Shop Floor is almost complete.

11/5/2013

The concrete slab for the shop floor is nearing completion.

10/28/2013

Exterior painting nears completion. Sidewalks around the building are also starting to be poured.

9/23/2013

The mezanine steel for the offices has been completed.

8/20/2013

Painting has begun.

5/25/2013

Aerial photo taken the day that the ceiling deck was completed.

5/21/2013

Steel is complete and ceiling panels cover the majority of the building.

5/13/2013

The steel and roof almost complete.

5/2/2013

Steel continued.

4/29/2013

First steel column goes up.

4/24/2013

The wall panels are complete.

4/19/2013

The outer walls near completion.

4/12/2013

The first wall goes up.

3/28/2013

Aerial View of the finished foundation.